Sale!

Troy Lee Designs Flowline MIPS MTB Helmet – 2023 Model

Original price was: $168.27.Current price is: $84.14.

Quantity
SKU: N/A Category: Brand:

Description

The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It’s NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment 
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters 
  • 5-Star Virginia Tech safety rating

Explore more from our collection.

Additional information

Color

CINNAMON, FOREST GREEN, GRAY, DARK BLUE, OASIS BLUE/BLACK, APPLE, MAGENTA/BLACK, MIRAGE BLUE, GOLD/BLACK, WHITE

Size

X-SMALL/SMALL, MEDIUM/LARGE, X-LARGE/XX-LARGE

Reviews

There are no reviews yet.

Be the first to review “Troy Lee Designs Flowline MIPS MTB Helmet – 2023 Model”

Your email address will not be published. Required fields are marked *